Tuesday 6 December 2016

Progress

As of last Monday we have:

1. Completed bedroom (ours) with no curtains but a sheet pinned up at the window for the time being.   The bed is on castors and has trouble staying put on the polished floor.  We need to invest in some castor cups to keep us anchored!  Next job, make the curtains.
2. Cleaned and serviceable en-suite - apart from the absence of a shower curtain.  The pole fell down into the bath when I tried to attach the curtain.  Hilarious!  Next job, fix the rail and decorate the bathroom.
3. Newly decorated from bedroom - without curtains or carpet and now full of the contents of the study which is being decorated as I write. Next job, make curtains and order carpet.
4. Curtains at one end of the sitting room only.  They have thermal lining which keeps the heat in and the light out.  I have noticed the cosy effect already.   Unfortunately the curtains aren't exactly the same length.  One is just a smidgeon longer than the other three.  How did that happen!?   They have to come down anyway as Peter needs to fill up the holes he made putting up the track, so the defect will be remedied.   Next job, put up track at the other end of the room and make curtains.

There are an awful lot of next jobs! 😩

No comments:

Post a Comment